Explore More

r-project-image

Core Cable Contractors were instructed to install, gland and terminate all the sub main and earth cables in the redevelopment of the Anfield Road stand at Liverpool Football club. These cables range from 25mm 4 core SWA to 240mm 4 core SWA cables. The upgraded stand added 7000 additional seats which boosted the stadium capacity to 61000

We had to overcome several challenges with this project including night working and keeping the sound level to a minimum due to the close proximity of local residents. Core completed the works within the client’s strict time-frame to have the stand ready for the 2024/25 season.

Liverpool Football Club

r-project-image

Core Cable Contractors of worked on several data centre from new build to full upgrade of existing data centre. This work consists of installing LV and MV cabling.

Core have worked on numerous data centre all over the country including London and Newport

Data Centre

r-project-image

Core Cable Contractors were instructed by close working partner to carry out installation on numerous Anglian Water project. This is part of Anglian Waters programme of works to upgrade the efficacy of the water treatments at a total cost of £1.2 billion over the next 5 years.

Core installed all types of cabling from fibre optic, instrumentation and mains power cables. Cables were installed using several different techniques including working at height and confined space.

Anglian Water